Views
Graph
Explorer
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 levels
Load all levels
All
Dagre
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 level
Load all levels
All
Tree
SpaceTree
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Radial
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Box
Focus
Expanding
Down
Up
All
Down
Page ✓
Article
Outline
Document
Down
All
Canvas
Time
Timeline
Calendar
Request email digest
Past 24 hours
Past 2 days
Past 3 days
Past week
Add
Add page
Add comment
Add citation
Edit
Edit page
Delete page
Share
Link
Bookmark
Embed
Social media
Login
Member login
Register now for a free account
🔎
There is a need for functionality tests prior to shipment
ArgumentGroup
1
#437963
Functionality tests should be performed on used equipment to determine its suitability for reuse.
CONTEXT
(Help)
-
Electronic Waste »
Electronic Waste
Electronic Waste☜An issue map of electronic waste as a matter of concern.☜F1CEB7
▲
Draft Technical Guidelines »
Draft Technical Guidelines
Draft Technical Guidelines☜An issue map of the negotiations over the design of Technical Guidelines on transboundary movement of e-waste, in particular regarding the distinction between waste and non-waste.☜9FDDBE
▲
Issues »
Issues
Issues☜☜FFB597
▲
Situations in which used equipment is or is not waste »
Situations in which used equipment is or is not waste
Situations in which used equipment is or is not waste☜☜FFB597
■
There is a need for functionality tests prior to shipment
There is a need for functionality tests prior to shipment☜Functionality tests should be performed on used equipment to determine its suitability for reuse.☜FF6D31
●
All equipment must be tested fully functional prior to shipment »
All equipment must be tested fully functional prior to shipment
All equipment must be tested fully functional prior to shipment☜An premise supporting shipments for maintenance, repair, or refurbishment on the condition that the equipment to be shipped is tested as fully functional before transboundary movement occurs.☜59C6EF
●
Clarification needed on meaning of 'fully functional' »
Clarification needed on meaning of 'fully functional'
Clarification needed on meaning of 'fully functional'☜☜59C6EF
●
Need for guidance on who performs testing »
Need for guidance on who performs testing
Need for guidance on who performs testing☜☜59C6EF
●
Tests need to capture broad range of equipment »
Tests need to capture broad range of equipment
Tests need to capture broad range of equipment☜☜59C6EF
●
Use key function approach »
Use key function approach
Use key function approach☜☜59C6EF
●
Meeting functionality test prior to shipment not always possible »
Meeting functionality test prior to shipment not always possible
Meeting functionality test prior to shipment not always possible☜There are situations, such as returns to manufacturers, in which functionality testing cannot be done prior to shipment. Those tests may only be able to be performed within specialized facilities at the manufacturer or subcontractor locations.☜EF597B
►
2010-09 Draft Technical Guidelines [2010 Sept] »
2010-09 Draft Technical Guidelines [2010 Sept]
2010-09 Draft Technical Guidelines [2010 Sept]☜☜FFFACD
►
2011-02 Draft Technical Guidelines [2011 Feb] »
2011-02 Draft Technical Guidelines [2011 Feb]
2011-02 Draft Technical Guidelines [2011 Feb]☜☜FFFACD
►
2012-05 Draft Technical Guidelines [2012 May] »
2012-05 Draft Technical Guidelines [2012 May]
2012-05 Draft Technical Guidelines [2012 May]☜☜FFFACD
◄
Meeting functionality test prior to shipment not always possible »
Meeting functionality test prior to shipment not always possible
Meeting functionality test prior to shipment not always possible☜There are situations, such as returns to manufacturers, in which functionality testing cannot be done prior to shipment. Those tests may only be able to be performed within specialized facilities at the manufacturer or subcontractor locations.☜FFFACD
Heading
Summary
Click the button to enter task scheduling information
Open
Details
Enter task details
Message text
Select assignee(s)
Due date (click calendar)
RadDatePicker
RadDatePicker
Open the calendar popup.
Calendar
Title and navigation
Title and navigation
<<
<
December 2024
>
<<
December 2024
S
M
T
W
T
F
S
48
24
25
26
27
28
29
30
49
1
2
3
4
5
6
7
50
8
9
10
11
12
13
14
51
15
16
17
18
19
20
21
52
22
23
24
25
26
27
28
53
29
30
31
1
2
3
4
Reminder
No reminder
1 day before due
2 days before due
3 days before due
1 week before due
Ready to post
Copy to text
Enter
Cancel
Task assignment(s) have been emailed and cannot now be altered
Lock
Cancel
Save
Comment graphing options
Choose comments:
Comment only
Whole thread
All comments
Choose location:
To a new map
To this map
New map options
Select map ontology
Options
Standard (default) ontology
College debate ontology
Hypothesis ontology
Influence diagram ontology
Story ontology
Graph to private map
Cancel
Proceed
+Comments (
0
)
- Comments
Add a comment
Newest first
Oldest first
Show threads
+Citations (
0
)
- Citations
Add new citation
List by:
Citerank
Map
+About
- About
Entered by:-
Josh Lepawsky
NodeID:
#437963
Node type:
ArgumentGroup
Entry date (GMT):
7/26/2016 11:28:00 AM
Last edit date (GMT):
2/13/2017 12:02:00 PM
Show other editors
Incoming cross-relations:
1
Outgoing cross-relations:
3
Average rating:
0
by
0
users
x
Select file to upload