Tests need to capture broad range of equipment

“Examples of functionality tests should be expanded to identify testing protocols for key categories or types of used and waste electronic and electrical where they may exist. Emerging guidance from Basel PACE should also be reviewed for functionality tests applicable to used computing equipment.”

From p. 3 of response by Canada to  Basel Secretariat. 2010. ‘Draft Technical Guidelines on Transboundary Movement of E-Waste, in Particular Regarding the Distinction between Waste and Non-Waste (Version 22 September 2010)’. http://www.basel.int/Implementation/Ewaste/TechnicalGuidelines/DevelopmentofTGs/tabid/2377/Default.aspx.

 

CONTEXT(Help)
-
Electronic Waste »Electronic Waste
Draft Technical Guidelines »Draft Technical Guidelines
Issues »Issues
Situations in which used equipment is or is not waste »Situations in which used equipment is or is not waste
There is a need for functionality tests prior to shipment »There is a need for functionality tests prior to shipment
Tests need to capture broad range of equipment
2010-09 Draft Technical Guidelines [2010 Sept] »2010-09 Draft Technical Guidelines [2010 Sept]
Canada »Canada
+Comments (0)
+Citations (0)
+About