There is a need for functionality tests prior to shipment
Functionality tests should be performed on used equipment to determine its suitability for reuse.
CONTEXT(Help)
-
Electronic Waste »Electronic Waste
Draft Technical Guidelines »Draft Technical Guidelines
Issues »Issues
Situations in which used equipment is or is not waste »Situations in which used equipment is or is not waste
There is a need for functionality tests prior to shipment
All equipment must be tested fully functional prior to shipment »All equipment must be tested fully functional prior to shipment
Clarification needed on meaning of 'fully functional' »Clarification needed on meaning of 'fully functional'
Need for guidance on who performs testing »Need for guidance on who performs testing
Tests need to capture broad range of equipment »Tests need to capture broad range of equipment
Use key function approach »Use key function approach
Meeting functionality test prior to shipment not always possible »Meeting functionality test prior to shipment not always possible
2010-09 Draft Technical Guidelines [2010 Sept] »2010-09 Draft Technical Guidelines [2010 Sept]
2011-02 Draft Technical Guidelines [2011 Feb] »2011-02 Draft Technical Guidelines [2011 Feb]
2012-05 Draft Technical Guidelines [2012 May] »2012-05 Draft Technical Guidelines [2012 May]
Meeting functionality test prior to shipment not always possible »Meeting functionality test prior to shipment not always possible
+Comments (0)
+Citations (0)
+About