Assumptions for Option 7b?
Assumptions of new road through Westfield, linking to Roebuck St without resumptions option
PAGE NAVIGATOR(Help)
-
Stirling Precinct 5 Workshops »Stirling Precinct 5 Workshops
What are the road network options for precinct 5? »What are the road network options for precinct 5?
Current viable road options? »Current viable road options?
7b. New road through Westfield linking to Roebuck St.  »7b. New road through Westfield linking to Roebuck St.
Assumptions for Option 7b?
Connection back to Scarborough Beach Rd »Connection back to Scarborough Beach Rd
May require traffic lights on Cloates St »May require traffic lights on Cloates St
Road closures from other options »Road closures from other options
+Commentaar (0)
+Citaten (0)
+About