Characteristics of Tunnel option?
PAGE NAVIGATOR(Help)
-
Stirling City Centre »Stirling City Centre
Transport »Transport
Roads »Roads
Long term plan for roads? »Long term plan for roads?
Tunnel option »Tunnel option
Characteristics of Tunnel option?
What timeframe? »What timeframe?
All 4 proposed east/west links included »All 4 proposed east/west links included
Leige/Odin stays as is in terms of its capacity requirements »Leige/Odin stays as is in terms of its capacity requirements
No connection at Cedric Street »No connection at Cedric Street
No freeway ramps at Stephenson Ave but a bridge over the freeway »No freeway ramps at Stephenson Ave but a bridge over the freeway
No side roads on the freeway »No side roads on the freeway
Northern entrance south of Karrinyup Rd »Northern entrance south of Karrinyup Rd
Southern entrance south of Scarborough Beach Rd »Southern entrance south of Scarborough Beach Rd
+Commentaar (0)
+Citaten (0)
+About