Views
Graph
Explorer
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 levels
Load all levels
All
Dagre
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 level
Load all levels
All
Tree
SpaceTree
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Radial
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Box
Focus
Expanding
Down
Up
All
Down
Page ✓
Article
Outline
Document
Down
All
Canvas
Time
Timeline
Calendar
Request email digest
Past 24 hours
Past 2 days
Past 3 days
Past week
Add
Add page
Add comment
Add citation
Edit
Edit page
Delete page
Share
Link
Bookmark
Embed
Social media
Login
Member login
Register now for a free account
🔎
Do nothing
Position
1
#24756
Short-term Dispersed Model
CONTEXT
(Help)
-
Stirling City Centre »
Stirling City Centre
Stirling City Centre☜☜F1CEB7
▲
Transport »
Transport
Transport☜☜FFB597
▲
Roads »
Roads
Roads☜☜FFB597
▲
Long term plan for roads? »
Long term plan for roads?
Long term plan for roads?☜☜FFB597
■
Do nothing
Do nothing☜Short-term Dispersed Model☜59C6EF
●
What are the characteristics of this model? »
What are the characteristics of this model?
What are the characteristics of this model?☜☜FFB597
●
Ability to be implemented in stages »
Ability to be implemented in stages
Ability to be implemented in stages☜☜98CE71
●
Constrains car usage by limiting road space »
Constrains car usage by limiting road space
Constrains car usage by limiting road space☜☜98CE71
●
Constrains commercial viability »
Constrains commercial viability
Constrains commercial viability☜Improves commercial exposure due to increasing traffic passing by local businesses☜98CE71
●
Good access to the freeway from the city centre »
Good access to the freeway from the city centre
Good access to the freeway from the city centre☜☜98CE71
●
Good pedestrian environment »
Good pedestrian environment
Good pedestrian environment☜☜98CE71
●
Lower capital cost »
Lower capital cost
Lower capital cost☜☜98CE71
●
Meets the demand »
Meets the demand
Meets the demand☜☜98CE71
●
Resiliency »
Resiliency
Resiliency☜No single point of failure☜98CE71
●
Shares the pain »
Shares the pain
Shares the pain☜☜98CE71
●
2031 estimates make this option impractical »
2031 estimates make this option impractical
2031 estimates make this option impractical☜Number of vehicles that key roads will support by 2031: Stephenson Bvld will carry 45000; Cedric St - 44,000; King Edward - 36000; Pearson - 52000; John Sanders Drive - 42000; Odin Rd - 36000; Liege Street - 37000. These estimates are from Main Roads traffic modelling☜EF597B
●
Community concern over Leige/odin »
Community concern over Leige/odin
Community concern over Leige/odin☜☜EF597B
●
Congestion-based nature of model leads to environmental issues »
Congestion-based nature of model leads to environmental issues
Congestion-based nature of model leads to environmental issues☜Congestion based nature leading to higher pollution, higher fuel consumption, greenhouse gas.☜EF597B
●
Increased volume of traffic on freeway side roads »
Increased volume of traffic on freeway side roads
Increased volume of traffic on freeway side roads☜33000 cars in each direction☜EF597B
●
Land ownership issues with the proposed Hutton Street extention »
Land ownership issues with the proposed Hutton Street extention
Land ownership issues with the proposed Hutton Street extention☜☜EF597B
●
Lots of major road conflict points »
Lots of major road conflict points
Lots of major road conflict points ☜At-grade intersection☜EF597B
●
Pedestrain safety issues »
Pedestrain safety issues
Pedestrain safety issues☜Due to increased traffic through city centre☜EF597B
●
Social amenities will not be as high in city centre »
Social amenities will not be as high in city centre
Social amenities will not be as high in city centre☜☜EF597B
Heading
Summary
Click the button to enter task scheduling information
Open
Details
Enter task details
Message text
Select assignee(s)
Due date (click calendar)
RadDatePicker
RadDatePicker
Open the calendar popup.
Calendar
Title and navigation
Title and navigation
<<
<
November 2024
>
<<
November 2024
S
M
T
W
T
F
S
44
27
28
29
30
31
1
2
45
3
4
5
6
7
8
9
46
10
11
12
13
14
15
16
47
17
18
19
20
21
22
23
48
24
25
26
27
28
29
30
49
1
2
3
4
5
6
7
Reminder
No reminder
1 day before due
2 days before due
3 days before due
1 week before due
Ready to post
Copy to text
Enter
Cancel
Task assignment(s) have been emailed and cannot now be altered
Lock
Cancel
Save
Comment graphing options
Choose comments:
Comment only
Whole thread
All comments
Choose location:
To a new map
To this map
New map options
Select map ontology
Options
Standard (default) ontology
College debate ontology
Hypothesis ontology
Influence diagram ontology
Story ontology
Graph to private map
Cancel
Proceed
+Comments (
0
)
- Comments
Add a comment
Newest first
Oldest first
Show threads
+Citations (
0
)
- Citations
Add new citation
List by:
Citerank
Map
+About
- About
Entered by:-
Paul Culmsee
NodeID:
#24756
Node type:
Position
Entry date (GMT):
9/8/2009 5:30:00 AM
Last edit date (GMT):
9/17/2009 2:41:00 PM
Show other editors
Incoming cross-relations:
0
Outgoing cross-relations:
0
Average rating:
0
by
0
users
x
Select file to upload