Advantages of Option 8c
Immediately related elementsHow this works
-
Stirling Precinct 5 Workshops »Stirling Precinct 5 Workshops
What are the road network options for precinct 5? »What are the road network options for precinct 5?
Current viable road options? »Current viable road options?
8c. Oswald St connection to Scarborough Beach Rd »8c. Oswald St connection to Scarborough Beach Rd
Advantages of Option 8c
Avoids the use of Roebuck St and Cloates St »Avoids the use of Roebuck St and Cloates St
Does not need a new intersection on Odin Rd »Does not need a new intersection on Odin Rd
Easements available »Easements available
Formalises some current connections that may be lost in future »Formalises some current connections that may be lost in future
No need to move Bunnings »No need to move Bunnings
Short and long term benefits »Short and long term benefits
There is a lot of wasted space available »There is a lot of wasted space available
+Kommentare (0)
+Verweise (0)
+About