9 Acquire, Construct, and Manage Assets (10010)
see below 4th of the additions to original
Full Process Description 30-Transform/Innovate 20-Change/
Improve
10-Run/
Operate
9 Acquire, Construct, and Manage Assets (10010) 1

9.1 Design and construct/acquire nonproductive assets (10937)

1
9.1.1 Develop property strategy and long-term vision (10941)
1
9.1.1.1 Confirm alignment of property requirements with business strategy (10955) 1

9.1.1.2 Assess the external environment (10956)
1
9.1.1.3 Make build-or-buy decision (10957) 1
9.1.2 Develop, construct, and modify sites (10942)
1
9.1.3 Plan facility (10943)
1
9.1.3.1 Design facility (10958) 1

9.1.3.2 Analyze budget (10959) 1

9.1.3.3 Select property (10960) 1
9.1.3.4 Negotiate terms for facility (10961)
1
9.1.3.5 Manage construction or modification to building (10962)
1
9.1.4 Provide workspace and assets (10944)
1
9.1.4.1 Acquire workspace and assets (10963)
1
9.1.4.2 Change fit/form/function of workspace and assets (10964)
1
9.2 Plan maintenance work (10938)
1
9.2.1 Perform routine maintenance (16472)

1
9.2.2 Perform corrective maintenance (16473)

1
9.2.3 Overhaul equipment (16474)

1
9.2.4 Manage facilities operations (10949)

1
9.2.4.1 Relocate people (10965)
1
9.2.4.2 Relocate material and tools (10966)

1
9.3 Obtain and install assets, equipment, and tools (10939)

1
9.3.1 Develop ongoing maintenance policies for productive assets (10950)

1
9.3.1.1 Analyze assets, and predict maintenance requirements (10967)

1
9.3.1.2 Develop approach to integrate preventive maintenance into production schedule (10968)
1
9.3.2 Obtain and install equipment (10951)

1
9.3.2.1 Design engineering solution for the manufacturing process (10969) 1

9.3.2.2 Install and commission equipment (10971)

1
9.4 Dispose of productive and nonproductive assets (10940)

1
9.4.1 Develop exit strategy (10952)
1
9.4.2 Perform sale or trade (10953)

1
9.4.3 Perform abandonment (10954)

1

6 14 14
Immediately related elementsHow this works
-
EA Use Case APQC Framework  Â»EA Use Case APQC Framework
1. Develop (Design) Vision and Strategy  Â»1. Develop (Design) Vision and Strategy
Business Models Â»Business Models
20-Change or Continuous Improvement business model Â»20-Change or Continuous Improvement business model
Design strategy to Mitigate Risk  Â»Design strategy to Mitigate Risk
10 Manage Enterprise Risk, Compliance, Remediation and Resiliency Â»10 Manage Enterprise Risk, Compliance, Remediation and Resiliency
12 Develop and Manage Business Capability Â»12 Develop and Manage Business Capability
9 Acquire, Construct, and Manage Assets (10010)
12 Develop and Manage Business Capability Â»12 Develop and Manage Business Capability
7 Manage Information Technology Â»7 Manage Information Technology