Views
Graph
Explorer
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 levels
Load all levels
All
Dagre
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 level
Load all levels
All
Tree
SpaceTree
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Radial
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Box
Focus
Expanding
Down
Up
All
Down
Page â
Article
Outline
Document
Down
All
Canvas
Time
Timeline
Calendar
Request email digest
Past 24 hours
Past 2 days
Past 3 days
Past week
Add
Add page
Add comment
Add citation
Edit
Edit page
Delete page
Share
Link
Bookmark
Embed
Social media
Login
Member login
Register now for a free account
đ
Inquiry - costs and benefits of the State Underground Power Program
Thema
1
#134436
Inquiry documents along with Western Power's submission
notice of inquiry into underground power.pdf
terms of reference.pdf
ERA Issues Paper.pdf
Western Power Submission.pdf
ERA draft report.pdf
Western Power Submission draft report.pdf
Final Report.pdf
Immediately related elements
How this works
-
Western Power »
Western Power
Western PowerââF1CEB7
▲
Regulators »
Regulators
RegulatorsââFFB597
▲
Economic Regulation Authority »
Economic Regulation Authority
Economic Regulation AuthorityââD3B8AB
■
Inquiry - costs and benefits of the State Underground Power Program
Inquiry - costs and benefits of the State Underground Power ProgramâInquiry documents along with Western Powers submissionâFFB597
►
State Underground Power Review »
State Underground Power Review
State Underground Power ReviewâMinisters terms of reference for review - see dm: 8627309âFFFACD
Heading
Summary
Click the button to enter task scheduling information
Open
Details
Enter task details
Message text
Select assignee(s)
Due date (click calendar)
RadDatePicker
RadDatePicker
Open the calendar popup.
Calendar
Title and navigation
Title and navigation
<<
<
November 2024
>
<<
November 2024
S
M
T
W
T
F
S
44
27
28
29
30
31
1
2
45
3
4
5
6
7
8
9
46
10
11
12
13
14
15
16
47
17
18
19
20
21
22
23
48
24
25
26
27
28
29
30
49
1
2
3
4
5
6
7
Reminder
No reminder
1 day before due
2 days before due
3 days before due
1 week before due
Ready to post
Copy to text
Enter
Cancel
Task assignment(s) have been emailed and cannot now be altered
Lock
Cancel
Save
Comment graphing options
Choose comments:
Comment only
Whole thread
All comments
Choose location:
To a new map
To this map
New map options
Select map ontology
Options
Standard (default) ontology
College debate ontology
Hypothesis ontology
Influence diagram ontology
Story ontology
Graph to private map
Cancel
Proceed
+Kommentare (
0
)
- Kommentare
Kommentar hinzufĂŒgen
Newest first
Oldest first
Show threads
+Verweise (
1
)
- Verweise
HinzufĂŒgen
List by:
Citerank
Map
Link
[1]
Inquiry into the Costs and Benefits of the State Underground Power Program
Zitieren:
ERA
Zitiert von:
Gus Riggs
3:03 AM 20 February 2012 GMT
URL:
http://www.erawa.com.au/2/940/46/inquiry_into_the_costs_and_benefits_of_the_state_u.pm?s=1
Auszug -
The State Treasurer asked the Economic Regulation Authority (ERA) on 23 April 2010 to conduct an inquiry into the overall costs and benefits of the State Underground Power Program.
In accordance with the Terms of Reference, the ERA was to have regard to:
the costs of undergrounding the overhead electricity distribution network;
a comparison of the costs associated with maintaining the current distribution network compared to undergrounding;
the types of costs which are avoided as a result of undergrounding the overhead electrical distribution system;
the identification and quantification (where possible) of all costs and benefits of underground power; and
an analysis of the distribution and timing of benefits, including an appraisal of who benefits and the overall public benefit to the wider community.
In particular, the ERA was to report on what the appropriate share of funding is between the Government, individual households and Western Power.
The cost benefit study was limited to the undergrounding of power in the South West Interconnected System.
In conducting this inquiry the ERA has published:
- an issues paper on 28 June 2010 to help interested parties understand the matters under review and to facilitate public submissions; and
- a draft report on 1 July 2011 for further public consultation. The submissions received in response to the issues paper and draft report are published on the ERA's website; and
- a final report outlining the costs and benefits of the SUPP major residential projects and proposed changes to the share of funding between the Government, individual households and the wider community.
+About
- About
Eingabe von:
Jason Froud
NodeID:
#134436
Node type:
Issue
Eingabedatum (GMT):
1/17/2012 4:01:00 AM
Zuletzt geÀndert am (GMT):
5/9/2012 3:13:00 AM
Show other editors
Eingehende Kreuzverbindungen
0
Abgehende Kreuzverbindungen
1
Durchschnittsbewertung
0
by
0
Nutzer
x
Select file to upload