9 Acquire, Construct, and Manage Assets (10010)

see below 4th of the additions to original

Full Process Description 30-Transform/Innovate 20-Change/
Improve
10-Run/
Operate
9 Acquire, Construct, and Manage Assets (10010) 1

9.1 Design and construct/acquire nonproductive assets (10937)

1
9.1.1 Develop property strategy and long-term vision (10941)
1
9.1.1.1 Confirm alignment of property requirements with business strategy (10955) 1

9.1.1.2 Assess the external environment (10956)
1
9.1.1.3 Make build-or-buy decision (10957) 1
9.1.2 Develop, construct, and modify sites (10942)
1
9.1.3 Plan facility (10943)
1
9.1.3.1 Design facility (10958) 1

9.1.3.2 Analyze budget (10959) 1

9.1.3.3 Select property (10960) 1
9.1.3.4 Negotiate terms for facility (10961)
1
9.1.3.5 Manage construction or modification to building (10962)
1
9.1.4 Provide workspace and assets (10944)
1
9.1.4.1 Acquire workspace and assets (10963)
1
9.1.4.2 Change fit/form/function of workspace and assets (10964)
1
9.2 Plan maintenance work (10938)
1
9.2.1 Perform routine maintenance (16472)

1
9.2.2 Perform corrective maintenance (16473)

1
9.2.3 Overhaul equipment (16474)

1
9.2.4 Manage facilities operations (10949)

1
9.2.4.1 Relocate people (10965)
1
9.2.4.2 Relocate material and tools (10966)

1
9.3 Obtain and install assets, equipment, and tools (10939)

1
9.3.1 Develop ongoing maintenance policies for productive assets (10950)

1
9.3.1.1 Analyze assets, and predict maintenance requirements (10967)

1
9.3.1.2 Develop approach to integrate preventive maintenance into production schedule (10968)
1
9.3.2 Obtain and install equipment (10951)

1
9.3.2.1 Design engineering solution for the manufacturing process (10969) 1

9.3.2.2 Install and commission equipment (10971)

1
9.4 Dispose of productive and nonproductive assets (10940)

1
9.4.1 Develop exit strategy (10952)
1
9.4.2 Perform sale or trade (10953)

1
9.4.3 Perform abandonment (10954)

1

6 14 14
RELATED ARTICLESExplain
EA Use Case APQC Framework
1. Develop (Design) Vision and Strategy
Business Models
20-Change or Continuous Improvement business model
Design strategy to Mitigate Risk
10 Manage Enterprise Risk, Compliance, Remediation and Resiliency
12 Develop and Manage Business Capability
9 Acquire, Construct, and Manage Assets (10010)
12 Develop and Manage Business Capability
7 Manage Information Technology
7 Manage Information Technology
Graph of this discussion
Enter the title of your article


Enter a short (max 500 characters) summation of your article
Enter the main body of your article
Lock
+Comments (0)
+Citations (0)
+About
Enter comment

Select article text to quote
welcome text

First name   Last name 

Email

Skip