comments
Respond
Comment on the article
Add a citation
Reply with an article
Start a new topic
Edit
Edit article
Delete article
Share
Invite
Link
Embed
Social media
Avatar
View
Graph
Explorer
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 levels
Load all levels
All
Dagre
Focus
Down
Load 1 level
Load 2 levels
Load 3 levels
Load 4 level
Load all levels
All
Tree
SpaceTree
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Radial
Focus
Expanding
Load 1 level
Load 2 levels
Load 3 levels
Down
All
Down
Box
Focus
Expanding
Down
Up
All
Down
Article ✓
Outline
Document
Down
All
Page
Canvas
Time
Timeline
Calendar
Updates
Subscribe to updates
Get updates
Past 24 hours
Past week
Past month
Past year
Pause updates
Contact us
Do nothing
Short-term Dispersed Model
RELATED ARTICLES
Explain
⌅
Stirling City Centre
Stirling City Centre☜☜F1CEB7
⌃
Transport
Transport☜☜FFB597
⌃
Roads
Roads☜☜FFB597
⌃
Long term plan for roads?
Long term plan for roads?☜☜FFB597
■
Do nothing
Do nothing☜Short-term Dispersed Model☜59C6EF
↳
What are the characteristics of this model?
What are the characteristics of this model?☜☜FFB597
↳
Ability to be implemented in stages
Ability to be implemented in stages☜☜98CE71
↳
Constrains car usage by limiting road space
Constrains car usage by limiting road space☜☜98CE71
↳
Constrains commercial viability
Constrains commercial viability☜Improves commercial exposure due to increasing traffic passing by local businesses☜98CE71
↳
Good access to the freeway from the city centre
Good access to the freeway from the city centre☜☜98CE71
↳
Good pedestrian environment
Good pedestrian environment☜☜98CE71
↳
Lower capital cost
Lower capital cost☜☜98CE71
↳
Meets the demand
Meets the demand☜☜98CE71
↳
Resiliency
Resiliency☜No single point of failure☜98CE71
↳
Shares the pain
Shares the pain☜☜98CE71
↳
2031 estimates make this option impractical
2031 estimates make this option impractical☜Number of vehicles that key roads will support by 2031: Stephenson Bvld will carry 45000; Cedric St - 44,000; King Edward - 36000; Pearson - 52000; John Sanders Drive - 42000; Odin Rd - 36000; Liege Street - 37000. These estimates are from Main Roads traffic modelling☜EF597B
↳
Community concern over Leige/odin
Community concern over Leige/odin☜☜EF597B
↳
Congestion-based nature of model leads to environmental issues
Congestion-based nature of model leads to environmental issues☜Congestion based nature leading to higher pollution, higher fuel consumption, greenhouse gas.☜EF597B
↳
Increased volume of traffic on freeway side roads
Increased volume of traffic on freeway side roads☜33000 cars in each direction☜EF597B
↳
Land ownership issues with the proposed Hutton Street extention
Land ownership issues with the proposed Hutton Street extention☜☜EF597B
↳
Lots of major road conflict points
Lots of major road conflict points ☜At-grade intersection☜EF597B
↳
Pedestrain safety issues
Pedestrain safety issues☜Due to increased traffic through city centre☜EF597B
↳
Social amenities will not be as high in city centre
Social amenities will not be as high in city centre☜☜EF597B
□
The King Edward Model
The King Edward Model☜☜00BFFF
□
Hutton from fwy to Jon Sanders
Hutton from fwy to Jon Sanders ☜☜59C6EF
□
Odin/Liege option
Odin/Liege option☜☜59C6EF
□
Stephenson Avenue elevated
Stephenson Avenue elevated☜☜59C6EF
□
Stephenson Hwy on the ground
Stephenson Hwy on the ground☜☜59C6EF
□
The intelligent transport system
The intelligent transport system☜The ITS Soft Model☜59C6EF
□
Tunnel duck-and-dive option
Tunnel duck-and-dive option☜☜59C6EF
□
Tunnel option
Tunnel option☜☜59C6EF
□
Graph of this discussion
Graph of this discussion☜Click this to see the whole debate, excluding comments, in graphical form☜dcdcdc
Enter the title of your article
Enter a short (max 500 characters) summation of your article
Click the button to enter task scheduling information
Open
Enter the main body of your article
Prefer more work space? Try the
big editor
Enter task details
Message text
Select assignee(s)
Due date (click calendar)
RadDatePicker
RadDatePicker
Open the calendar popup.
Calendar
Title and navigation
Title and navigation
<<
<
November 2024
>
<<
November 2024
S
M
T
W
T
F
S
44
27
28
29
30
31
1
2
45
3
4
5
6
7
8
9
46
10
11
12
13
14
15
16
47
17
18
19
20
21
22
23
48
24
25
26
27
28
29
30
49
1
2
3
4
5
6
7
Reminder
No reminder
1 day before due
2 days before due
3 days before due
1 week before due
Ready to post
Copy to text
Enter
Cancel
Task assignment(s) have been emailed and cannot now be altered
Lock
Cancel
Save
Comment graphing options
Choose comments:
Comment only
Whole thread
All comments
Choose location:
To a new map
To this map
New map options
Select map ontology
Options
Standard (default) ontology
College debate ontology
Hypothesis ontology
Influence diagram ontology
Story ontology
Graph to private map
Cancel
Proceed
+Comments (
0
)
- Comments
Add a comment
Newest first
Oldest first
Show threads
+Citations (
0
)
- Citations
Add new citation
List by:
Citerank
Map
+About
- About
Entered by:-
Paul Culmsee
NodeID:
#24756
Node type:
Position
Entry date (GMT):
9/8/2009 5:30:00 AM
Last edit date (GMT):
9/17/2009 2:41:00 PM
Show other editors
Incoming cross-relations:
0
Outgoing cross-relations:
0
Average rating:
0
by
0
users
Enter comment
Select article text to quote
Cancel
Enter
welcome text
First name
Last name
Email
Skip
Join
x
Select file to upload